Skip to content

Flashcards

52 cards on the backflow tester exam. Turn each one over, then say whether you knew it. The ones you didn't come round again.

Card 1 of 520 knew it · 0 again

Swipe right if you knew it, left to see it again. On a keyboard: Enter turns the card, the arrow keys mark it.

All 52 cards

Criteria

RP relief valve: minimum opening point
2.0 psid or higher
RP check valve one: minimum differential
5.0 psid or higher
RP buffer requirement
Check valve one at least 3.0 psid above the relief valve opening point
Double check: minimum differential per check
1.0 psid or higher, and drip tight
PVB and SVB air inlet: minimum opening point
1.0 psi or higher above atmosphere, and it must open fully
PVB and SVB check valve: minimum differential
1.0 psid or higher
RP check valve two: what is it tested for
Tightness against backpressure, and 1.0 psid on the final differential reading

Dimensions

PVB height above the highest downstream outlet
At least twelve inches
AVB height above the outlets
At least six inches
Air gap, clear of obstructions
Twice the effective opening, never less than one inch
Air gap, affected by a near wall
Three times the effective opening
Assembly height above grade
About twelve inches minimum to the bottom, about thirty inches maximum to the centre line
Barometric loop height
About thirty five feet, since the atmosphere supports about thirty four feet of water

Hydraulics

Feet of water supported by one psi
2.31 feet
Pressure produced by one foot of water
0.433 psi
Feet of water per inch of mercury
1.133 feet
Atmospheric pressure at sea level
14.7 psi, about 29.9 inches of mercury, about 34 feet of water
Gallons per minute to cubic feet per second
Divide by 448.83
A gauge held below the reference point reads
High, by 0.433 psi for every foot

Standards

ASSE 1013
Reduced pressure principle assembly
ASSE 1015
Double check valve assembly
ASSE 1020
Pressure vacuum breaker assembly
ASSE 1056
Spill-resistant vacuum breaker assembly
ASSE 5110
Backflow prevention assembly tester certification
ASSE 5120, 5130 and 5150
Cross-connection control surveyor, repairer and programme administrator
AWWA C510
Double check valve assembly product standard. C511 is the reduced pressure principle assembly

Selection

High hazard with backpressure
Reduced pressure principle assembly, and nothing less
High hazard, backsiphonage only
PVB, SVB or RP. Never a double check
Low hazard with backpressure
Double check as the minimum, RP always acceptable
What a vacuum breaker cannot do
Resist backpressure, at any hazard level and any height
Classification of lawn irrigation
A health hazard, because of what is in the soil
The only protection against every degree of hazard
An air gap

Procedure

Test cock flushing order
Open four, three, two, one. Close one, two, three, four
PVB test order
Air inlet first, then the check valve
SVB test order
Check valve first, then the air inlet
Test cocks straddling RP check valve one
Test cocks two and three
Test cocks straddling check valve two
Test cocks three and four
How far to open the low control for a relief valve reading
No more than a quarter turn, so the pressure falls slowly
Why reset the gauge before reading check valve one
To relieve disc compression, which otherwise reads high
Two drips from an RP relief vent after a reset
Check valve two has failed under backpressure
Identifying an assembly by its test cocks
Four means RP or DC, two means PVB, one plus a vent means SVB

Administration

How often an installed assembly is tested
Annually in most jurisdictions
How often a tester certificate is renewed
Every three years in most programmes. Washington is annual
Gauge calibration interval
Within the twelve months before the test
Texas continuing education requirement
Twenty four hours over a three year licence term
California accreditation deadline
1 July 2027, when only ANSI accredited bodies count
Ohio certificate classes
A for general isolation, B for irrigation, C for purveyor owned
Who receives a completed test report
The water purveyor and the property owner

Troubleshooting

The fault that imitates every other fault
A leaking number one shut-off valve
Relief valve discharging only under downstream demand
A hydraulic problem with the supply, not a component failure
Intermittent relief discharge after new plumbing work
Thermal expansion in a newly closed system
A needle that bounces and will not settle
Air in the hoses, or flow still moving through the assembly