Set D Questions 31 to 35
- 31
Why is the low bleed closed last when setting up?
Explanation
Closing the low side first traps pressure on it and leaves the needle sitting somewhere it should not. The RP uses the same order every time it is read.
- 32
Which is true about a double check and continuous pressure?
Explanation
That is a defining difference from an atmospheric vacuum breaker, which cannot be left under continuous pressure.
- 33
What should be recorded for each check on the test report?
Explanation
Both pieces of information matter, because a check can read above 1.0 and still be recorded as leaking.
- 34
Why are double checks common on fire service lines?
Explanation
Fire systems are pressure sensitive and vaults are common, and both of those favour a double check over an RP.
- 35
What is suspected if a double check will not reach atmosphere?
Explanation
A second feed into the same downstream piping is the other common cause, and it makes the assembly untestable until isolated.