Set D Questions 31 to 35
- 31
What is the correct order for returning an RP to service?
Explanation
Opening fast sends a surge downstream and can lift debris into fixtures the tester was not hired to fix.
- 32
What is check valve one on an RP loaded to hold?
Explanation
The higher loading is what creates the margin the relief valve needs. That is also why an RP costs more pressure.
- 33
How does an RP behave when the supply pressure fails completely?
Explanation
Draining the zone is the correct behaviour. It guarantees an open path to atmosphere rather than a path to the main.
- 34
Which reading is taken after resetting the gauge for disc compression?
Explanation
A disc held hard against its seat reads higher than it will hold in service, so the reset gives the honest number.
- 35
What does a rising gauge after closing test cock two indicate?
Explanation
That step is specifically there to catch a leaking downstream shut-off, which is recorded on the report.