Set B Questions 11 to 20
- 11
What is recorded as the relief valve opening point?
Explanation
First discharge is the criterion. Waiting for a steady stream reads low and can fail a good assembly.
- 12
What is the minimum acceptable relief valve opening point?
Explanation
All three of those numbers appear in an RP test, which is why they get confused so often.
- 13
How is check valve two on an RP tested?
Explanation
A differential reading across check two is taken later, but the backpressure observation is the one that matters.
- 14
Which test cock takes the vent hose during the backpressure phase?
Explanation
Test cock four is downstream of check valve two, which is where the backpressure has to come from.
- 15
What does one drip from the relief vent mean in that phase?
Explanation
A second drip after a proper reset is what condemns check valve two. One drip on its own does not.
- 16
What does a second drip after a gauge reset indicate?
Explanation
That is the point of resetting and watching twice. It separates residual water from a genuine leak.
- 17
Why is the gauge reset before reading check valve one?
Explanation
A disc held hard against its seat reads higher than it will hold in service.
- 18
What is the minimum differential for check valve one on an RP?
Explanation
Both parts are required. The second part is what a plain subtraction calculator misses.
- 19
What is checked immediately after the check valve one reading?
Explanation
A rise on the gauge at that point means the downstream shut-off is passing water back in.
- 20
Which test cocks are used to read check valve two on an RP?
Explanation
That pair straddles check valve two, in the same way cocks two and three straddled check valve one.