  1. 21

    In what order are the bleeds closed when reading check valve two?

  2. 22

    What is the minimum differential for check valve two on an RP?

  3. 23

    What is done with the needle valves at the end of a test?

  4. 24

    How is the outlet shut-off valve opened at the end of a test?

  5. 25

    What does it mean if the relief valve will not open during a test?

  6. 26

    What should be recorded about the assembly before testing?

  7. 27

    How many separate readings does a full RP test produce?

  8. 28

    What is the purpose of the vent hose on an RP test?

  9. 29

    When is the vent control closed during the backpressure phase?

  10. 30

    What does the tester do if the assembly fails?