Topic 14 · Study plan and project management
Set E Questions 41 to 50
- 41
When creating a detailed project budget during the planning phase, which of the following is strictly categorized as an "Indirect Cost" (Overhead)?
Explanation
Indirect Costs (Overheads) are umbrella expenses required to keep the host institution running (rent, lights, admin). Direct costs are expenses strictly and exclusively generated by the specific project itself.
- 42
Which phrase accurately defines the "FINER" criteria letter 'E'?
Explanation
The 'E' in FINER stands for Ethical. Even if a research question is highly Interesting and Novel (e.g., "What happens if we intentionally mutate diseases in humans without consent?"), if it isn't strictly Ethical, the study fails.
- 43
State whether true or false: A highly rigorous data collection instrument should mathematically strive to severely prioritize "Validity" over "Feasibility" to the point where patients physically refuse to take the intensive 4-hour test.
Explanation
FALSE. In project management, everything is a compromise. An exquisitely valid 4-hour survey that no human being will actually consent to complete generates zero data. Feasibility must balance validity.
- 44
In project management, what happens if the "Scope" (the sheer volume of objectives and tasks) heavily increases uncontrollably during implementation?
Explanation
This is known universally as "Scope Creep." If the PI constantly adds "just one more little test" or "just one more variable," the study will chronically run out of money and time before finishing.
- 45
What is the absolute primary function of drafting a formalized "Dummy Table" during the severe planning phase?
Explanation
A Dummy Table is an entirely empty version of the final publication tables. By trying to mentally fill it out BEFORE the study, you instantly realize, "Wait, how can I stratify by Age if I forgot to put an Age question on the survey?"
- 46
Which team member is strictly responsible for actively translating the complex clinical protocol directly into daily logistical field operations?
Explanation
While the PI designs the science, the Study Coordinator is the supreme logistical manager who schedules vehicles, prints forms, handles field staff arguments, and monitors daily execution.
- 47
State whether true or false: It is a phenomenal project management practice to leave the exact data analysis tools (e.g., defining exactly what statistical test to run) entirely unstated until AFTER all data is fully collected over 5 years.
Explanation
FALSE. The Data Analysis Plan must be rigidly locked during Protocol writing. Leaving it open introduces massive risk that the data collected is incompatible with the necessary tests, rendering 5 years of work statistically useless.
- 48
When actively monitoring the rigorous field collection, a "Quality Assurance" (QA) visit from the central project manager primarily aims to:
Explanation
Quality Assurance (QA) explicitly verifies that the processes mapped out in the protocol (e.g., storing blood samples at exactly -20°C, asking survey questions in the identical order) are being rigidly followed by remote staff.
- 49
In planning a large multicentric study, what does the rigorous formal term "Calibration" of instruments truly refer to?
Explanation
If Center A has a weighing scale that reads +2kg, and Center B has a scale reading -1kg, the combined data will be highly infected by severe systematic instrumental bias. Instruments (and human surveyors) must be rigidly checked and Calibrated against a gold standard.
- 50
State whether true or false: Meticulous record keeping and archiving of the original raw paper surveys must systematically be maintained for years even after the main project is successfully published.
Explanation
TRUE. Under Good Clinical Practice (GCP) and massive scientific integrity standards, original raw data must be safely archived for several years. This securely allows independent auditors to verify the data wasn't fabricated if the results are ever questioned.