The ABC exam hands you a formula and conversion table, but the clock runs out while you hunt for the right line, so the formula is worth knowing the moment you read the question. Read each situation, name the one that settles it, and type it in. 20 scenarios to have them ready.

Scenario 1 of 20Score 0

You have a flow in MGD and a concentration in mg/L and need pounds per day.

All 20 scenarios

  1. You have a flow in MGD and a concentration in mg/L and need pounds per day.

    lbs = MGD x mg/L x 8.34

    The pounds formula. 8.34 is the weight of a gallon of water and is what turns a concentration into a weight.

  2. You know the BOD applied per day and the pounds of MLVSS under aeration.

    F/M = lbs BOD / lbs MLVSS

    Food over microorganisms. Use MLVSS rather than MLSS, because the volatile fraction stands in for the living organisms.

  3. You need the average number of days a solid particle stays in the plant.

    MCRT = lbs in system / lbs leaving per day

    Aeration plus clarifier solids on top, wasted plus effluent solids underneath. Both halves of each side matter.

  4. You ran a settleometer and have the MLSS. You want the settling quality as one number.

    SVI = (mL/L x 1000) / MLSS

    Sludge volume index, in millilitres per gram. Above roughly 150 the sludge is bulking.

  5. Solids are carrying over the secondary weir. You want the upward rise velocity.

    SOR = flow / surface area

    Surface overflow rate in gallons per day per square foot. Do not include the return flow in this one.

  6. You need the loading of solids onto a secondary clarifier.

    Solids loading = lbs solids per day / area

    This one does include the return flow, because the return carries solids into the clarifier.

  7. You are loading a trickling filter and know the applied BOD and the media volume.

    Organic loading = lbs BOD per day / 1000 cu ft

    Trickling filters are loaded per 1,000 cubic feet of media volume. RBCs are loaded per 1,000 square feet of media area.

  8. You want the return sludge flow that balances solids across the clarifier.

    RAS = (MLSS x Q) / (RAS SS - MLSS)

    A solids balance. The thinner the return sludge, the higher the rate the balance calls for.

  9. You need the percent of volatile solids destroyed across a digester.

    Van Kleeck

    Van Kleeck, not a plain percentage. Digestion removes mass, so the fixed solids left behind would otherwise skew the answer.

  10. A pump moves a known gpm against a known head and you want the useful horsepower.

    WHP = (gpm x head) / 3960

    Water horsepower. Divide by pump efficiency for brake horsepower, then by motor efficiency for motor horsepower.

  11. You know a basin volume and the plant flow and need the time water sits in it.

    DT = Volume / Flow

    Detention time. Put the flow into the same time unit you want the answer in before you divide.

  12. A round tank has a known diameter and depth and you need the volume.

    V = 0.785 x D2 x depth

    Cubic feet. Multiply by 7.48 for gallons and divide by a million for the MG the pounds formula wants.

  13. A gauge reads psi and you need the equivalent head in feet.

    1 psi = 2.31 ft

    Multiply psi by 2.31 for feet of head. Divide feet by 2.31 to go back to psi.

  14. You have the flow and the pipe diameter and need to know whether the sewer is scouring.

    Velocity = Flow / Area

    Two feet per second is the minimum scouring velocity in a gravity sewer.

  15. You need the percent of BOD removed across the plant.

    Removal = (In - Out) / In x 100

    Secondary treatment is generally expected to remove at least 85 percent of BOD and suspended solids.

  16. An industrial discharge needs comparing with a residential population.

    PE = lbs BOD per day / 0.17

    One person contributes about 0.17 pounds of BOD per day.

  17. You measured initial and final dissolved oxygen on a diluted sample.

    BOD = (DOi - DOf) x 300 / sample mL

    Scale the depletion up from the sample volume to the full 300 mL bottle. Subtract any seed correction first.

  18. You need the fall per hundred feet between two manholes.

    Slope = drop / distance x 100

    Slope as a percentage. It is what gives a gravity line its velocity.

  19. You want how long a wet well takes to draw down while flow is still coming in.

    Time = storage / (pump - inflow)

    Subtract the inflow first. The pump is only gaining on the well at the difference between the two rates.

  20. Two streams of different strength combine and you need the blended concentration.

    C1V1 + C2V2 = C3V3

    Concentrations never average. Weight each one by its flow, add them, and divide by the combined flow.