Code tables · 3 of 9
Activated Sludge Process Control
Wastewater Operator Math
Three different ways of measuring the same population of organisms.
| Quantity | How it is found |
|---|---|
| F/M ratio | Pounds BOD per day / Pounds MLVSS under aeration |
| MCRT or SRT, days | Pounds in aeration and clarifier / Pounds wasted and lost per day |
| Sludge age, days | Pounds MLSS in aeration / Pounds suspended solids applied per day |
| Sludge volume index | (Settled volume, mL/L x 1,000) / MLSS, mg/L |
| Sludge density index | 100 / SVI |
| Return sludge flow | (MLSS x Plant flow) / (RAS solids - MLSS) |
Check the figures against the edition of the Formula & Conversion Table your exam uses; local amendments can change them.