Topic 10 · Inspections & Maintenance
Set A Questions 1 to 10
- 1
How often must a mobile crane receive a shift inspection under 1926.1412(d)?
Explanation
The visual inspection must begin before each shift the equipment will be used and be completed before or during that shift.
- 2
Who must conduct the shift inspection?
Explanation
The shift inspection is a competent person's job. The annual comprehensive inspection is a qualified person's job, which is a higher bar.
- 3
Does the shift inspection require a document to be kept?
Explanation
Only the monthly and annual inspections carry documentation requirements. Many employers keep a shift record anyway, and it is the record that protects the crew later.
- 4
How long must a monthly inspection record be kept?
Explanation
1926.1412(e)(3)(ii) sets a minimum of three months for the monthly inspection document.
- 5
How long must an annual comprehensive inspection record be kept?
Explanation
1926.1412(f)(7) requires the annual document to be maintained and retained for a minimum of twelve months.
- 6
What must a monthly inspection record contain?
Explanation
The regulation names the items checked and the results, plus the name and signature of the person who conducted the inspection and the date.
- 7
How often must the annual comprehensive inspection be performed?
Explanation
1926.1412(f)(1) requires it at least every twelve months, by a qualified person, with disassembly as necessary to complete it.
- 8
Who must perform the annual comprehensive inspection?
Explanation
The annual inspection requires a qualified person, defined as someone with a recognised degree, certificate or professional standing, or extensive knowledge and experience.
- 9
What distinguishes a qualified person from a competent person?
Explanation
A competent person can identify hazards and has authority to correct them. A qualified person has a degree, certificate, professional standing or extensive knowledge to resolve the problem.
- 10
A deficiency is found in shift inspection item (v), hooks and latches. What happens next?
Explanation
1926.1412(d)(2) requires an immediate determination by the competent person, and the crane comes out of service only if the deficiency is a safety hazard.