Topic 07 · Operations & Load Control
Set C Questions 21 to 30
- 21
What should be done if the crane's engine stops with a load suspended?
Explanation
The manufacturer's manual covers this. Ad hoc solutions such as releasing a brake with no power to control the descent are how loads are dropped.
- 22
Why should an operator avoid dragging a load along the ground with the hoist?
Explanation
Dragging is one of the classic causes of side loading, and a load that catches and then releases delivers a shock load on top of it.
- 23
What is the risk of hoisting a load that is snagged or frozen to the ground?
Explanation
A snagged load resists with a force nobody can predict. The crane may be pulled down onto its front before the load moves at all.
- 24
Which of these describes proper hoisting practice?
Explanation
Slack taken up slowly avoids the shock load that comes from a hoist that is already moving when the rope goes tight.
- 25
What is the purpose of a tagline?
Explanation
Taglines keep people out from under the load while still giving control over its rotation and swing.
- 26
Where should personnel stand while a load is being moved?
Explanation
Nobody under the load, nobody in its path, and nobody in the swing radius. The area behind the counterweight is one of the most dangerous places on a site.
- 27
What must be considered when two cranes lift the same load?
Explanation
1926.1432 requires a multiple crane lift to be planned by a qualified person and directed by a competent and qualified person, because load can transfer between the machines as they move.
- 28
Why is load capacity normally reduced on a multiple crane lift?
Explanation
Small differences in hoist speed or ground movement transfer load between the machines. Planners commonly derate each crane substantially for this reason.
- 29
What is the concern with hoisting personnel using a crane?
Explanation
1926.1431 sets out when personnel hoisting is allowed, and it requires that no other means of reaching the work area is possible or safer, plus a long list of conditions.
- 30
What must be checked about wind before and during operations?
Explanation
Wind limits come from the crane's own documentation. A large flat load can be a problem at wind speeds far below the crane's structural limit.