Skip to content

Set B Questions 11 to 20

Question 1 of 10 · 0 answered · 0 correct

  1. 11

    What must be verified before the boom is raised during assembly?

  2. 12

    What is a common cause of injury during crane assembly?

  3. 13

    What must be done before disassembling a boom that is supported by the load line?

  4. 14

    What is the role of blocking during boom assembly on the ground?

  5. 15

    Why is a crane's counterweight installed in a specific sequence?

  6. 16

    What should be done if the manufacturer's assembly procedure is not available?

  7. 17

    What must be considered when selecting the area for crane assembly?

  8. 18

    During assembly, what is the concern with a partially assembled boom left overnight?

  9. 19

    What is a common consequence of not fully extending the outriggers?

  10. 20

    What does the term outrigger spread mean?