    Why do fully extended outriggers give higher capacity than retracted ones?

  2. 22

    What must be done with the crane's tyres when it is set on outriggers, on most charts?

  3. 23

    What must be checked about pins used in boom assembly?

  4. 24

    When must a crane be inspected after assembly?

  5. 25

    What must the A/D director do about the boom and jib assembly sequence?

  6. 26

    What is the risk when a boom is raised for the first time after assembly?

  7. 27

    What should be done about the swing radius before crane operations start?

  8. 28

    Why must the crane's boom be positioned as the manufacturer directs before jacking on outriggers?

  9. 29

    What should an operator do when an outrigger will not fully extend?

  10. 30

    What does it mean to set an outrigger, as opposed to extending it?