Topic 06 · Setup, Outriggers & Assembly
Set D Questions 31 to 38
- 31
What is a stabiliser, as distinct from an outrigger?
Explanation
Stabilisers steady the machine but do not necessarily lift it clear of its tyres. The regulation names outriggers and stabilisers together for exactly this reason.
- 32
A crane is being set up in wind. What should be considered before raising the boom?
Explanation
Assembly wind limits are often lower than operating limits, because a part built boom is less stable and the crew are working around it.
- 33
What is the concern with a crane assembled on a slight slope?
Explanation
Assembly assumes a firm, level working area. On a slope, sections can roll and the machine can move as its balance changes.
- 34
What must be verified about the wire rope reeving after assembly?
Explanation
Reeving against the manufacturer's specification is both a post assembly check and a shift inspection item under 1926.1412(d)(1)(vi).
- 35
Why does the number of parts of line have to be correct after assembly?
Explanation
Too few parts and the rope is overloaded. Too many and the hook speed is unnecessarily slow, which tempts a crew to reeve short later.
- 36
What is the purpose of a boom stop?
Explanation
Boom stops are a safety device under 1926.1415. A boom pulled over backwards falls onto the cab and the machine, and it happens very quickly.
- 37
What is a common cause of a boom being pulled over backwards?
Explanation
With little or no load, nothing holds the boom forward. Raising past the safe angle, especially with a following wind or on a slope, lets it go over backwards.
- 38
What should be checked about the machine after it is moved to a new setup position on the same site?
Explanation
Every move is a new setup. Ground and level are both shift inspection items that the regulation specifically ties to each move and setup.