- 31
What is the concern with a crane set up next to a retaining wall?
Explanation
Retaining walls are designed for a particular soil pressure. Concentrated crane loading behind one can push it over.
- 32
Why is the crane's route across a site checked for pinch and crush points?
Explanation
The Core exam's site domain names access, in transit clearances, pinch and crush points and personnel as hazards to identify and evaluate.
- 33
A crane is being set up in an area with recent excavation nearby. What should happen?
Explanation
The load from an outrigger spreads downward and outward. If that cone reaches the excavation face the soil can shear and the crane goes with it.
- 34
What does the term supporting foundation mean in the shift inspection requirement?
Explanation
The regulation asks for the ground and the supporting foundations to be checked, which includes anything placed between the machine and the soil.
- 35
What is the effect of an outrigger being extended only part way when the chart assumes full extension?
Explanation
If the chart has no column for that outrigger position then no tested capacity exists for it, and the figures in the cab do not describe the machine.
- 36
Why must the tyres be clear of the ground on many outrigger charts?
Explanation
If the machine is partly on its tyres, the load path is not the one the chart was tested with, and the suspension introduces movement the chart never accounted for.
- 37
What should an operator do when the ground conditions are not adequate and the controlling entity will not correct them?
Explanation
1926.1417 gives the operator the authority to stop operations. Ground that will not take the machine is not something a smaller load reliably fixes.
- 38
What is the purpose of a designated area for a crane on a busy site?
Explanation
Separating the crane's working zone from foot and vehicle traffic removes the pinch and crush exposure that the site domain of the exam is largely about.