You have a suction pressure and a suction line temperature, and want superheat.
All 30 scenarios
You have a suction pressure and a suction line temperature, and want superheat.
SH = line temp - dew point temp
Superheat is measured from the dew point, because that is where the last liquid finished boiling.
You have a liquid line pressure and a liquid line temperature, and want subcooling.
SC = bubble point temp - line temp
Subcooling is measured from the bubble point, the mirror image of superheat.
A fixed orifice system, and you need to know what superheat to charge to today.
(3 x IWB - 80 - ODB) / 2
Indoor wet bulb captures both sensible and latent load. The target moves with the weather, so it is recalculated each visit.
You know the sensible capacity and the temperature drop across the coil, and want airflow.
cfm = Btu/h / (1.08 x dT)
The 1.08 combines air's specific heat, its density and sixty minutes per hour, at sea level.
You measured supply and return static pressure and want what the blower is fighting.
TESP = |supply| + |return|
The return reads negative because the blower pulls on it. Adding the sizes gives the total resistance.
You have two gauge readings and want the compression ratio.
CR = absolute discharge / absolute suction
Both readings must be converted to absolute first. Dividing gauge readings straight across is the classic trap.
You measured amps and volts on a run capacitor and want its actual capacitance.
uF = 2652 x amps / volts
The 2652 is one million divided by two pi times sixty, so it only holds at 60 hertz.
Three leg voltages on a three phase supply, and you need the imbalance.
Max deviation from average / average x 100
NEMA MG-1 calls for derating a motor above 1 percent, and many equipment makers allow no more than 2 percent, because a small voltage imbalance produces a much larger current imbalance.
You have the compressor RLA and the fan amps and need the circuit ampacity.
MCA = 1.25 x largest motor + others
The largest motor takes the 125 percent factor and everything else is added at nameplate value.
You worked out the maximum overcurrent protection and it fell between two breaker sizes.
Round down
A breaker larger than the calculated maximum does not protect the equipment it was sized for.
You know the blower rating, the accessory losses and the longest run, and want the friction rate.
FR = available static x 100 / TEL
Available static is the blower rating less the coil, filter and accessory losses.
You are timing a gas meter dial to find what a furnace is actually burning.
Input = 3600 / seconds x dial size x heating value
Every other gas appliance in the building must be off, or their gas is counted as the furnace's.
You are speeding a blower up and want to know what happens to the motor load.
Power varies with the cube of speed
Airflow follows speed, pressure the square, and power the cube. Twenty percent more speed is seventy-three percent more load.
A comfort cooling chiller holding 200 pounds, and you need the leak rate that triggers repair.
10 percent
Comfort cooling is 10 percent, commercial refrigeration 20, industrial process refrigeration 30.
A leak above the trigger rate has been found and you need the repair deadline.
30 days
Thirty days from the date of discovery, or a retrofit or retirement plan instead.
A low pressure centrifugal chiller, and you need the required evacuation level before opening it.
25 mm Hg absolute
The deepest requirement in the whole table, and the only one stated in absolute units.
An R-22 split system holding 12 pounds, and you need the required evacuation level.
0 inches Hg
A high pressure appliance under 200 pounds needs only to be brought to atmospheric pressure.
Filling a recovery cylinder, and you need the limit.
80 percent by weight
By weight, not by feel. Liquid has nowhere to expand into and the cylinder ruptures.
A small appliance with a working compressor and modern recovery equipment.
90 percent
Ninety percent when the compressor works, eighty when it does not, or evacuate to 4 inches of vacuum.
You want to sell recovered refrigerant to a different customer.
Reclaim to AHRI 700
Change of ownership is what triggers the reclaim requirement. Same owner reuse needs only recovery.
You need to pressure test a system for leaks and have no refrigerant to spare.
Dry nitrogen with a regulator
Never oxygen, which can explode with refrigerant oil, and never compressed air, which carries moisture in.
Superheat comes back high and subcooling comes back low.
Undercharge
Not enough refrigerant to fill the condenser or feed the coil. Find the leak before adding any.
Superheat comes back high and subcooling also comes back high.
Restriction
Refrigerant is present but cannot get through. Adding more makes it worse.
Superheat comes back low and subcooling comes back high.
Overcharge
The condenser is flooded and the evaporator overfed. Recover down to the correct charge.
You need the required evacuation before charging, measured on a micron gauge.
500 microns
Five hundred is the usual target, but the decay test matters more than the number.
During a decay test the vacuum rises quickly then levels off.
Moisture
Moisture boils off and stops at the vapour pressure of water. A leak keeps climbing without levelling.
You are charging a zeotropic blend and need to know how to take it from the cylinder.
As liquid
Drawing vapour takes the more volatile component first and leaves the wrong mixture behind.
A rectangular duct, and you need to compare it against a round duct sizing chart.
De = 1.30 x (ab)^0.625 / (a+b)^0.25
Two ducts of the same area do not carry the same air. A flat one has more wall and more friction.
A furnace temperature rise reads above the range on the data plate.
Not enough airflow
It will cycle on the high limit, and each cycle stresses the heat exchanger keeping flue gas out of the house.
You need the design airflow range for a residential cooling system.
350 to 450 cfm per ton
Below 350 the coil can freeze; above 450 the system stops removing humidity.