Set B Questions 11 to 20

Question 1 of 10 · 0 answered · 0 correct

  1. 11

    During backfilling, the first layer of backfill over the pipe shall be placed in layers not exceeding ____ thick.

  2. 12

    A pipe sleeve must be at least ____ larger than the pipe.

  3. 13

    Fire-rated assembly penetrations need:

  4. 14

    Toilet rooms must be per IPC and:

  5. 15

    Toilet facilities for construction workers must be located no further than ____ from the working area.

  6. 16

    A water test applied to a drainage and vent system must be applied with a minimum water head of:

  7. 17

    How long must a water test be held upon a drainage system to pass inspection?

  8. 18

    If conducting an air test on the drainage and vent system, what is the required minimum pressure?

  9. 19

    For how long must the 5 psi air test for drainage and venting be maintained without introducing additional air?

  10. 20

    Which piping material is explicitly prohibited by IPC from being tested with compressed air?