Question 1 of 10 · 0 answered · 0 correct

  1. 21

    The final plumbing test for a DWV system involves a visual inspection and, if required by the official, a:

  2. 22

    In a smoke test, what pressure must be introduced and maintained in the system?

  3. 23

    In a peppermint test, how many ounces of oil of peppermint are required per 10 feet of stack height?

  4. 24

    Water supply systems must test to:

  5. 25

    Gravity sewer pipes test requires:

  6. 26

    Pipes through concrete walls require:

  7. 27

    Rooms without windows need:

  8. 28

    V-Zone plumbing must resist:

  9. 29

    Exterior drain openings must be protected from:

  10. 30

    For condensate drains serving air-conditioning equipment, the minimum drain diameter for equipment up to 20 tons is: