Skip to content

Set B Questions 11 to 20

Question 1 of 10 · 0 answered · 0 correct

  1. 11

    Cleanouts shall be installed at intervals NOT exceeding ____ feet in horizontal drainage lines.

  2. 12

    Cleanouts must be installed at each change of direction of a horizontal drainage pipe that is greater than:

  3. 13

    If multiple changes of direction occur within a run of ____ feet, only one cleanout is required for the entire distance.

  4. 14

    What is the required minimum clearance (working space) in front of a cleanout for a pipe that is 6 inches or larger in diameter?

  5. 15

    What is the required minimum clearance in front of a cleanout on a pipe that is smaller than 6 inches in diameter?

  6. 16

    Cleanout sizes must match the size of the pipe served, up to a maximum cleanout size of:

  7. 17

    Building sewers shall be provided with a cleanout where they connect to a building drain, located within ____ of the building wall.

  8. 18

    If an off-set is installed in a soil stack, and it is made at an angle of 45 degrees or less to the vertical, how is the stack sized?

  9. 19

    An offset in a soil stack made at an angle greater than 45 degrees to the vertical must be sized based on:

  10. 20

    What is the minimum pipe size for any building drain serving a water closet?