Skip to content

Set E Questions 41 to 50

Question 1 of 10 · 0 answered · 0 correct

  1. 41

    A sewage ejector receiving the discharge of water closets must have a vent pipe sized not less than:

  2. 42

    Can you tie a sump pump discharge from a foundation drain (groundwater) into the sanitary building drain?

  3. 43

    When doing a final visual inspection of drainage piping, trenches should be left open until:

  4. 44

    Can you drill or tap a hole into a cast-iron drainage pipe to create a new connection using a saddle?

  5. 45

    The discharge end of a building sewer pipe entering a public sewer should connect via a:

  6. 46

    Any fixture draining onto a floor (like a mop sink lacking a proper rim) must have a floor drain with a trap size of at least:

  7. 47

    What type of PVC joint cement (primer limit) is required for most non-pressure drainage piping?

  8. 48

    Which pipe material is commonly referred to as "no-hub" or "hubless" in the trade?

  9. 49

    What is the "developed length" of a pipe?

  10. 50

    When an older building undergoes a change of occupancy or use that generates more solid waste, what must be done to the existing sanitary drainage system?