Set E Questions 41 to 50
- 41
A sewage ejector receiving the discharge of water closets must have a vent pipe sized not less than:
Explanation
IPC 712.3.3 / Table 916.5.1: Sump vents must be sized according to pump discharge rate, with minimum vent size generally starting at 1-1/2 inches for ejectors handling solids/water closets.
- 42
Can you tie a sump pump discharge from a foundation drain (groundwater) into the sanitary building drain?
Explanation
IPC 701.2: Storm water, groundwater, and subsoil drain water shall not be drained into sewers intended for sanitary drainage only.
- 43
When doing a final visual inspection of drainage piping, trenches should be left open until:
Explanation
IPC 312.1.2: Underground piping shall not be covered or concealed until it has been inspected, tested, and approved by the code official.
- 44
Can you drill or tap a hole into a cast-iron drainage pipe to create a new connection using a saddle?
Explanation
IPC 706.1/704.4: Saddle fittings or fittings that rely on tapping the pipe wall are prohibited for drainage due to snagging debris and leaking.
- 45
The discharge end of a building sewer pipe entering a public sewer should connect via a:
Explanation
IPC 703 (and local sewer codes): Connections to the public sewer must use approved manufactured fittings (wyes or tee-wyes) designed to facilitate flow downstream.
- 46
Any fixture draining onto a floor (like a mop sink lacking a proper rim) must have a floor drain with a trap size of at least:
Explanation
IPC 412.3: Floor drains require a minimum of 2-inch waste outlet and trap.
- 47
What type of PVC joint cement (primer limit) is required for most non-pressure drainage piping?
Explanation
IPC 705.14.2: A purple primer is standardly required, except that a one-step solvent cement is permitted for non-pressure PVC piping up to 4 inches if approved.
- 48
Which pipe material is commonly referred to as "no-hub" or "hubless" in the trade?
Explanation
Hubless refers to cast iron soil pipe that lacks the traditional bell and spigot hubs, joined instead by elastomeric sleeves and stainless steel banded clamps.
- 49
What is the "developed length" of a pipe?
Explanation
IPC Definitions: Developed length is defined as the length of a pipeline measured along the centerline of the pipe and fittings.
- 50
When an older building undergoes a change of occupancy or use that generates more solid waste, what must be done to the existing sanitary drainage system?
Explanation
IPC 102.3: Existing systems can generally remain if safe and sanitary, but any change in use that increases the load beyond the system’s capacity requires upgrades to meet the new code demands.