Set C Questions 21 to 30

Question 1 of 10 · 0 answered · 0 correct

  1. 21

    What device is used to firmly support vertical piping runs extending through floor penetrations?

  2. 22

    What is the required backfill material for underground pipe bedding?

  3. 23

    When backfilling over an underground plastic pipe, the initial layer of backfill material placed over the pipe must be carefully compacted until it is at least ____ above the pipe before machinery is used.

  4. 24

    If a trench is over-excavated (dug too deep) during pipe installation, what must be done before laying the pipe?

  5. 25

    A horizontal copper pipe passes through a hole bored in a wooden stud. Does the hole itself count as an approved support?

  6. 26

    To prevent damage from freezing, water piping located in exterior walls must be:

  7. 27

    A water pipe installed parallel to a building footing must not be installed deeper than:

  8. 28

    When piping passes through a foundation wall, what accommodation is typically required around the pipe?

  9. 29

    Piping installed underground beneath a concrete slab requires a minimum trench depth to protect the pipe, but what must surround the pipe in the trench?