Topic 10 · Regulations & Responsibilities
Set D Questions 31 to 40
- 31
What is the duty of the lift director?
Explanation
The lift director organises the operation, confirms the plan and the roles, and stops work if conditions are not right.
- 32
What must be done with a sling that has been heated above 1,000 degrees F?
Explanation
Above 1,000 degrees F the removal is permanent. Between 600 and 1,000 degrees F the working load limit is reduced per the manufacturer.
- 33
What is required before a new chain sling enters service?
Explanation
Each new, repaired or reconditioned alloy steel chain sling must be proof tested before use, along with its attachments.
- 34
Which record must an employer retain for chain sling proof testing?
Explanation
The employer must retain a certificate of the proof test and make it available for examination.
- 35
What NCCCO certifications relate directly to rigging work?
Explanation
Rigger Level I and II cover rigging knowledge and practice, and Signalperson covers directing crane motion.
- 36
How long does a CCO certification normally remain valid?
Explanation
CCO certifications run for five years, after which recertification is required to keep them current.
- 37
What distinguishes Rigger Level II from Rigger Level I?
Explanation
Level II covers advanced material such as multi-leg tension maths, centre of gravity, load rotation control and hardware engineering.
- 38
What must a rigger do when asked to perform work beyond their qualification?
Explanation
Qualification is task specific. Working beyond it puts the rigger and everyone downrange at risk and leaves the employer non-compliant.
- 39
What is required regarding hoisting personnel with a crane?
Explanation
Personnel hoisting needs an approved platform, a total load of no more than half the rated capacity, a trial lift, and a proof test to 125 percent with a competent person's inspection afterwards, among other measures (1926.1431).
- 40
What is the employer duty regarding defective equipment found by a worker?
Explanation
Defective equipment comes out of service immediately. Moving it elsewhere simply relocates the hazard.