Topic 08 · Signals & Communication
Set C Questions 21 to 30
- 21
Who is responsible for making sure signals are understood?
Explanation
Both parties must agree on the signals before the lift. If either is unsure, the lift does not start.
- 22
What happens if the operator disagrees with a signal for safety reasons?
Explanation
The operator has final authority over the crane and can stop any operation believed to be unsafe.
- 23
What is required of the signal system in poor visibility?
Explanation
Fog, darkness or dust may make hand signals impossible, in which case radio or another agreed method must be used.
- 24
What must be established before each lift regarding signalling?
Explanation
This is settled at the pre-lift meeting. Sorting it out mid-lift with a load in the air is far too late.
- 25
What does an audible signal system typically use?
Explanation
Patterns of blasts convey the meanings, and everyone involved must know the pattern before work starts.
- 26
Why must the signalperson be positioned out of the fall zone?
Explanation
Signalling from under the load puts the one person watching most closely in the most dangerous place on site.
- 27
What does the hand signal with the arm extended, fingers closed and the thumb pointing up or down indicate?
Explanation
A fist with the thumb up raises the boom and thumb down lowers it. Extending the boom uses both thumbs pointing outward.
- 28
When must signalling arrangements be reconfirmed during a job?
Explanation
A change of signalperson is a change of the control system. The handover is explicit and the operator acknowledges it.
- 29
What is the effect of two people signalling at once?
Explanation
The operator has no way to know which to follow. Only one designated signalperson gives signals at any moment.
- 30
Which crane motion is signalled by the term trolley on a tower crane?
Explanation
The trolley traverses the jib and changes the radius. On a mobile crane the equivalent change comes from boom angle or length.