Topic 09 · Site Hazards & Power Lines
Set E Questions 41 to 45
- 41
What is the risk of a tag line contacting a power line?
Explanation
A rope that is wet, muddy or contaminated conducts well enough to be lethal. Clearance applies to everything, not just the boom.
- 42
What should be assessed about the load itself for hazards?
Explanation
Sharp edges cut slings, contents shift or leak, and loose parts fall. All three are checked before rigging.
- 43
What hazard arises when a load is lifted with liquid inside?
Explanation
A partly full vessel has a moving centre of gravity. It can start swinging on its own and will not settle under the hook.
- 44
What is the correct action when a hazard is identified mid-lift?
Explanation
The plan no longer matches the conditions. Stopping costs minutes and restarting after a proper assessment costs very little more.
- 45
Which is the most common serious crane hazard on construction sites?
Explanation
Power line contact and being struck by a load account for a large share of crane fatalities, which is why clearance rules are so specific.