32 treatment plant symbols you'll see on a process drawing, each drawn as it appears on the page, with its tag and what it means.
32 symbols
Process Units
Rapid Mix Basin
Flash mix chamber where coagulant is dispersed. Drawn as a small square with a paddle or turbine symbol inside.
Process Units
Flocculation Basin
Slow-mix chamber where floc grows. Usually shown as a long rectangle divided into stages.
Process Units
Sedimentation Basin
Clarifier where floc settles by gravity. Drawn as a rectangle or circle with a sludge hopper at the base.
Process Units
Filter
Granular media filter. Shown as a box with hatched or dotted media layers.
Process Units
Clearwell
Finished water storage providing disinfection contact time before distribution.
Process Units
Elevated Storage Tank
Provides system pressure and equalisation storage. Drawn as a tank on legs.
Process Units
Aerator
Strips dissolved gases and oxidises iron and manganese. Shown as a tray stack or spray pattern.
Valves
Gate ValveGV
Isolation valve, fully open or fully closed. Drawn as two triangles meeting at a point.
Valves
Butterfly ValveBFV
Quarter-turn valve common on large mains. Shown as a bowtie with a line through the centre.
Valves
Check ValveCV
Allows flow in one direction only. Prevents backflow when a pump stops.
Valves
Pressure Reducing ValvePRV
Holds a set downstream pressure regardless of upstream variation.
Valves
Air Release ValveARV
Vents trapped air from a high point in a main to prevent air binding.
Valves
Altitude ValveALT
Closes automatically when a storage tank reaches its set level.
Pumps & Drives
Centrifugal Pump
The standard plant pump. Drawn as a circle with a tangential discharge line.
Pumps & Drives
Vertical Turbine Pump
Multi-stage pump set in a wet well or well casing, motor mounted above.
Pumps & Drives
Metering PumpMP
Positive displacement pump feeding a precise chemical dose.
Pumps & Drives
Variable Frequency DriveVFD
Varies motor speed to match output to demand, saving energy at part load.
Instruments
Flow IndicatorFI
Local flow reading. Instrument bubbles carry letters: first letter is the measured variable.
Instruments
Flow Indicating TransmitterFIT
Measures flow and transmits the signal to SCADA.
Instruments
Pressure IndicatorPI
Local pressure gauge on a line or vessel.
Instruments
Level Indicating TransmitterLIT
Reports tank or basin level to the control system.
Instruments
Turbidity AnalyserAIT
Continuous turbidity measurement, typically on each filter effluent.
Instruments
Chlorine Residual AnalyserCL2
Continuous residual monitoring used to demonstrate CT compliance.
Instruments
pH AnalyserpHT
Continuous pH measurement, critical to both coagulation and disinfection.
Chemical Feed
Chemical Storage Tank
Bulk storage for a liquid chemical, usually with level indication and containment.
Chemical Feed
Day TankDT
Small tank holding roughly one day of chemical, fed from bulk storage.
Chemical Feed
ChlorinatorCLR
Meters gas chlorine into a water stream under vacuum.
Chemical Feed
Dry Chemical FeederDCF
Volumetric or gravimetric feeder for lime, soda ash or powdered carbon.
Piping & Lines
Process Line
A solid heavy line. Carries the main water flow through the plant.
Piping & Lines
Instrument Signal Line
A dashed line. Carries a measurement or control signal, never water.
Piping & Lines
Sample LineSP
Small-diameter tap drawing water to an analyser or lab sink.
Piping & Lines
Backwash Waste LineBWW
Carries spent backwash water to recovery or waste.
Symbols and tags vary from one plant's drawings to the next; the legend on the drawing always wins.