Code tables · 9 of 11
Softening & Demineralisation
ABC Formulas & Conversions
Hardness, lime demand and membrane performance.
| Quantity | Formula |
|---|---|
| Non-carbonate hardness | Total hardness - Total alkalinity (zero when alkalinity is equal or greater) |
| Lime demand (mg/L) | ((2.27 x CO2) + Total Alk + (4.12 x Mg)) x 0.56 |
| Water treated (gal) | exchange capacity grains / hardness gpg |
| Bypass flow (gpd) | (total flow x finished hardness) / raw hardness |
| Salt required (lbs) | salt lbs per 1,000 grains x grains removed / 1,000 |
| Mineral rejection % | (1 - product TDS / feed TDS) x 100 |
| Recovery % | (product flow / feed flow) x 100 |
| Soda ash | non-carbonate hardness x (106 / 100) |
Check the figures against the edition of the ABC Formula Sheet your exam uses; local amendments can change them.