Code tables · 1 of 9
Field Test Pass Criteria
USC Manual of Cross-Connection Control field test criteria; AWWA M14
Every criterion for all four testable assemblies. Three of these numbers live inside a single RP test and belong to different components, which is where most errors come from.
| Assembly | Component | Requirement |
|---|---|---|
| RP / RPDA | Relief valve | Opens at 2.0 psid or higher |
| RP / RPDA | Check valve #1 | Holds 5.0 psid or higher |
| RP / RPDA | Buffer | CV1 at least 3.0 psid above the relief point |
| RP / RPDA | Check valve #2 | Tight against backpressure, 1.0 psid |
| DC / DCDA | Check valve #1 | Holds 1.0 psid or higher, drip tight |
| DC / DCDA | Check valve #2 | Holds 1.0 psid or higher, drip tight |
| DCDA / RPDA | Bypass meter | Registers flow on test cock 4 |
| PVB | Air inlet | Opens at 1.0 psi or higher, opens fully |
| PVB | Check valve | Holds 1.0 psid or higher |
| SVB | Check valve | Holds 1.0 psid or higher |
| SVB | Air inlet | Opens at 1.0 psi or higher, opens fully |
Check the figures against the edition of the Field Test Procedures your exam uses; local amendments can change them.