Skip to content

Code tables

The 9 Cross-Connection Control tables that come up most on the exam. Each one is laid out in full, with the section it comes from.

  1. 01Field Test Pass CriteriaEvery criterion for all four testable assemblies. Three of these numbers live inside a single RP test and belong to different components, which is where most errors come from.USC Manual of Cross-Connection Control field test criteria; AWWA M1411 rows
  2. 02Assembly SelectionThe minimum acceptable assembly for each combination of hazard and cause. An authority having jurisdiction may always require more, and an air gap is acceptable everywhere.Standard selection practice, AWWA M145 rows
  3. 03Identifying an AssemblyCounting the test cocks tells you what you are looking at before anything is opened.ASSE 1013, 1015, 1020 and 10565 rows
  4. 04Test Cock PositionsWhere each test cock sits on a four cock assembly, and which pair straddles which check.AWWA M14 Appendix B, UF-TREEO field procedures4 rows
  5. 05Installation Heights and ClearancesThe dimensions checked on arrival, before the gauge comes out. Local code may be stricter.ASME A112.1.2 for the air gaps, and standard installation practice8 rows
  6. 06Hydraulic ConversionsThe figures a tester uses on site. The first two cover every gauge elevation and residual pressure question on the exam.Standard hydraulics11 rows
  7. 07Standards and What They CoverThe 1000 series covers products. The 5000 series covers people. Questions mix them deliberately.ASSE International and AWWA published standards11 rows
  8. 08State Programmes ComparedRenewal cycles, education and gauge rules for the four state programmes this app covers. Administrative rules move, so check the citation before relying on any row.CCCPH 3.4.1; 30 TAC Ch. 30; WAC 246-292-034; ORC 3703.21 and OAC 1301:3-7-024 rows
  9. 09Symptom to First MoveWorked in the order that costs the least. A leaking number one shut-off imitates almost every component failure on this list.Standard field troubleshooting practice10 rows