Code tables · 5 of 9
Installation Heights and Clearances
ASME A112.1.2 for the air gaps, and standard installation practice
The dimensions checked on arrival, before the gauge comes out. Local code may be stricter.
| Item | Requirement |
|---|---|
| Assembly above grade, minimum | 12 in to the bottom of the body |
| Assembly above grade, maximum | About 30 in to the centre line |
| PVB above highest downstream outlet | At least 12 in |
| AVB above outlets | At least 6 in |
| RP relief discharge | Air gap to atmosphere, never direct |
| RP in a pit or vault | Not permitted where the port could flood |
| Air gap, clear of walls | 2 x effective opening, minimum 1 in |
| Air gap, near a wall | 3 x effective opening |
Check the figures against the edition of the Field Test Procedures your exam uses; local amendments can change them.