Installation Heights and Clearances

ASME A112.1.2 for the air gaps, and standard installation practice

The dimensions checked on arrival, before the gauge comes out. Local code may be stricter.

ItemRequirement
Assembly above grade, minimum12 in to the bottom of the body
Assembly above grade, maximumAbout 30 in to the centre line
PVB above highest downstream outletAt least 12 in
AVB above outletsAt least 6 in
RP relief dischargeAir gap to atmosphere, never direct
RP in a pit or vaultNot permitted where the port could flood
Air gap, clear of walls2 x effective opening, minimum 1 in
Air gap, near a wall3 x effective opening