CCO Mobile Crane Operator Exam
Code tables
The 12 CCO tables that come up most on the exam. Each one is laid out in full, with the section it comes from.
- 01Power Line Clearance, Table AMinimum clearance while operating near an energised line. The distance applies to any part of the equipment, the load line, or the load including rigging and lifting accessories. A line is assumed energised until the utility confirms it has been deenergised and visibly grounded at the worksite.
- 02Power Line Clearance While TravellingTravelling with no load and the boom lowered gets a shorter distance, and only if the conditions in 1926.1411 are met: a dedicated spotter whenever any part of the equipment will get closer than 20 feet, and at night or in poor visibility the lines lit or otherwise identified and a safe path of travel identified.
- 03Shift Inspection ItemsWhat a competent person must look at before every shift the crane is used. A deficiency in items (i) to (xiii) goes to the competent person under 1926.1412(d)(2). A deficiency in item (xiv) goes to 1926.1412(d)(3) instead, which sends you to 1926.1415 and 1926.1416. Two items on one list, two different consequences.
- 04Inspection Frequency and Record RetentionThe shift inspection is required but no document has to be kept. The monthly and annual ones require a record carrying the items checked, the results, and the name, signature and date of the person who did it.
- 05Wire Rope Removal CriteriaWhen a running rope comes off the crane. Any one of these on its own is enough.
- 06Load Angle FactorsMultiply a leg's share of the load by the factor for the angle it hangs at. Every one of these is one divided by the sine of the angle. Learn 30, 45, 60 and 90, because the Core exam does not allow a calculator.
- 07Boom Angle FactorsRadius uses the cosine and height uses the sine. Multiply the boom length by the factor. Three of these carry most of the exam: 30, 45 and 60 degrees.
- 08Stability Basis for Rated LoadsHow much of the tipping load a manufacturer may publish as a rated load. This comes from ASME B30.5 and the test method in SAE J765, and is named here rather than reproduced. Worth being exact about the source: 29 CFR 1926.1433 states no percentage at all, it incorporates the ASME and SAE standards by reference. Citing OSHA for these numbers is wrong, and operators do check.
- 09Typical Allowable Ground Bearing PressurePlanning values only. What the ground on your site will actually carry comes from a geotechnical report or from the controlling entity, and under 29 CFR 1926.1402 it is the controlling entity that has to provide ground adequate to support the crane. Ground that held yesterday may not hold after rain, and nothing on the surface tells you about a void or a backfilled trench underneath it.
- 10Material WeightsPounds in one cubic foot. Steel at 490 and concrete at 150 cover most exam questions, and both are worth knowing without looking them up.
- 11Weight and Length ConversionsA metric tonne is about 10% heavier than a US ton. Reading one as the other hands you capacity the crane does not have.
- 12Wind Pressure by SpeedThe push a flat-sided load takes, per square foot of the face the wind sees. Force climbs with the square of the speed, so twice the wind is four times the push. Your crane's own chart notes set the limit, not this table.