Two bodies of rules govern this work and they carry different weight. 29 CFR 1926 Subpart CC is federal law. ASME B30.5 is a consensus standard that becomes enforceable where a regulation incorporates it. Knowing which is which matters, because the exam asks and because quoting the wrong source undermines everything else you say.
What it covers
Subpart CC section by section, 1910.180 for general industry, the ASME B30 volumes, operator certification and evaluation, modifications, and the split of duties between the parties.
On the exam
Section numbers are asked directly. So is the distinction between what OSHA requires and what an industry standard recommends.
How to prepare
Learn Subpart CC by subject rather than by number, then attach the numbers to the subjects you already know.
- 29 CFR 1926 Subpart CC - cranes and derricks in construction.
- 29 CFR 1910.180 - crawler, locomotive and truck cranes in general industry.
- ASME B30.5 - mobile and locomotive cranes. Cited by name, not federal law in itself.
- 1926.1402 - ground conditions, the controlling entity's duty.
- 1926.1408 - power line safety during operation.
- 1926.1412 - inspections.
- 1926.1417 - operation, including the operator's authority to stop.
- 1926.1424 - work area control and the swing radius barricade.
- 1926.1427 - operator certification and the employer's evaluation.
The one that trips people up
The 85% of tipping on outriggers and 75% on crawlers figures come from ASME B30.5, tested by the method in SAE J765. 29 CFR 1926.1433 states no percentage at all; it incorporates those standards by reference. Attributing the figure to OSHA is wrong, and it is the kind of error that makes an examiner doubt everything else on the paper.
Everything else
- Certification alone is not enough. 1926.1427 also requires the employer to evaluate the operator for that equipment and that work, and to document it.
- The operator's authority to stop under 1926.1417 is not overridden by a signal, a supervisor or a schedule.