Code tables · 2 of 12
Maximum Turnover Time by Venue
2023 MAHC Table 4.7.1.10
The busier and shallower the water, the faster it has to be turned over. A wading pool carries the highest contamination risk per gallon in the whole facility, which is why it sits at one hour.
| Type of venue | Turnover maximum |
|---|---|
| Interactive water play | 0.5 hours |
| Plunge pool | 1 hour |
| Runout slide | 1 hour |
| Wading pool | 1 hour |
| Activity pool | 2 hours |
| Lazy river | 2 hours |
| Wave pool | 2 hours |
| All other pools | 6 hours |
| Diving pool | 8 hours |
| Surf pool | engineering justification required |
Check the figures against the edition of the Pool & Spa Operator Handbook your exam uses; local amendments can change them.