Skip to content

Regulations & Compliance

Regulations and Compliance covers the Safe Drinking Water Act and the rules built on it. The exam does not expect a lawyer - it expects an operator who knows which rule applies, what the limits mean, and when the public must be told. MCL versus MCLG, and the conditions that trigger public notification, are the two things worth being certain about.

What it covers

The Safe Drinking Water Act, MCLs and MCLGs, the Surface Water Treatment Rule, the Lead and Copper Rule, monitoring and reporting, and public notification.

On the exam

Definition and trigger questions. You will be asked what a term means and what event obliges you to act.

How to prepare

Learn the enforceable-versus-goal distinction first. It underpins a surprising share of the questions.

How to attack this topic

  • MCL is enforceable. MCLG is a health goal with no enforcement and no cost consideration. Confusing the two is the classic error.
  • Loss of pressure in the distribution system is the standard boil-water trigger, because it is a direct contamination pathway.
  • Lead and copper samples are first draw, after at least six hours standing. Flushing the tap first defeats the purpose of the sample.
  • When a question asks who must be notified and how fast, the severity of the health risk sets the answer.