Sedimentation
Sedimentation is the removal of floc by gravity, and it is judged by three numbers: detention time, surface loading rate and weir overflow rate. When settled turbidity climbs, one of those three is nearly always the reason. Sludge management matters as much as hydraulics, because sludge left in a basin creates its own problems.
What it covers
Clarifier hydraulics, the three loading rates, short circuiting, and sludge removal.
On the exam
A mix of calculation and troubleshooting. You will be asked to compute a loading rate, and separately to explain why floc is carrying over a weir.
How to prepare
Learn which rate is calculated against which denominator. Weir uses weir length, surface loading uses surface area, detention time uses volume. Confusing them is the whole difficulty.
How to attack this topic
- Floc over the weir points at weir overflow rate first. Adding weir length is the standard fix.
- Short circuiting means water reaches the outlet faster than the detention time suggests. Look for inlet baffling and density currents in the answers.
- Sludge left too long goes septic. That is the reason behind most taste, odour and floating-solids questions on this topic.