The double check field test: one measurement, taken twice.
Straddle the check with the gauge, isolate the assembly, bring the downstream side to atmosphere, and read the differential when the flow stops and the needle settles. Then move one cock downstream and do it again.
The gauge centre line must be level with the downstream test cock reference. Every foot off level shifts the reading by 0.433 psi, and against a 1.0 psid criterion two feet of error is most of the available margin.
A reading that falls away to zero is a leak, not a low number, and it is recorded that way.
Straddle: connecting the high and low hoses to the test cocks either side of the component being tested.
Static measurement: taken with no flow through the assembly.
Reference point: the outlet of the downstream test cock, or the water level in a sight tube.
This is the easiest of the four procedures and the best one to learn first, because the RP repeats the same straddling technique twice inside a longer test.
Expect at least one question on elevation error. Know that one foot is 0.433 psi and that a gauge held below the reference reads high.