PVB & SVB Construction

The PVB and the SVB: one check, one air inlet, and a limitation that no installation height can overcome.

Both assemblies carry the same two criteria, and both are 1.0. The air inlet must begin to open at 1.0 psi or higher above atmosphere and must open fully once the body drains. The check valve must hold 1.0 psid or higher.

Neither protects against backpressure. That is not a limitation that can be designed around, and it is why a vacuum breaker on a boiler feed or a pumped line is simply wrong.

A PVB must sit at least twelve inches above the highest downstream outlet. Below that there is no siphon for the air inlet to break.

Air inlet: a spring loaded poppet that admits air to break a siphon.

Spill resistant: the SVB vents through a controlled valve rather than discharging from the body, which is what makes it usable indoors.

Canopy: the cover over the air inlet, removed for testing.

The order of the two tests is a favourite question. The PVB tests the air inlet first. The SVB tests the check valve first, because its vent valve lets the body come to atmosphere without spilling.

Six inches is the atmospheric vacuum breaker. Twelve inches is the pressure vacuum breaker. Candidates swap those two constantly.