Skip to content

RP Construction

How a reduced pressure principle assembly is built and why it is the only one approved for a health hazard under backpressure.

Two independent checks with a zone between them, and a relief valve whose only job is to keep that zone below the supply pressure. The relief valve does not sense the checks at all. It senses the margin, and it opens when the margin is lost.

That is what makes an RP different. A double check that fails goes on looking exactly the same. An RP that fails puts water on the floor.

Three numbers live in this assembly and they belong to different components. The relief valve opens at 2.0 psid or higher. Check valve one holds 5.0 psid or higher. The buffer between them is 3.0 psid or higher.

Reduced pressure zone: the space between the two checks, deliberately held below the supply pressure.

Buffer: how far check valve one sits above the relief valve opening point.

RPDA: the detector version, with a metered bypass for fire lines.

Learn the three numbers with the component attached to each one. Candidates who memorise 2.0, 3.0 and 5.0 as a list end up putting them against the wrong parts under pressure.

An assembly reading 5.5 across check one with a relief valve opening at 3.5 fails. Both numbers pass on their own and the buffer is only 2.0. Expect to see that exact case.