Setup, Outriggers & Assembly

Setup and assembly is the largest domain on the Specialty exam after load charts, and it is where the assembly and disassembly director appears. Under 1926.1404 that person has to meet the criteria for both a competent and a qualified person, which is a higher bar than anything else in the standard.

What it covers

Outrigger extension and setting, levelling, assembly and disassembly procedures, the A/D director's duties, boom and jib assembly, counterweight installation and the post assembly inspection.

On the exam

Expect both procedural questions and questions about who is responsible for what. The distinction between a competent person and a qualified person is tested repeatedly.

How to prepare

Learn the sequence and learn why each step is in that order. Almost every assembly rule exists because somebody was crushed between two sections or because a machine went over during jacking.

  • A/D director - the assembly and disassembly director required by 1926.1404.
  • Competent person - able to identify hazards and authorised to correct them promptly.
  • Qualified person - has recognised standing or extensive knowledge to resolve the problem.
  • Outrigger spread - the distance between opposite outrigger floats.
  • Float - the foot at the bottom of the outrigger jack.
  • Setting an outrigger - lowering the jack until it takes load, as distinct from extending the beam.

How to attack this topic

  • Chart capacities assume fully extended and set outriggers with the tyres clear, unless a separate column exists for another position. If no column covers your position, no tested capacity exists for it.
  • Level is checked before each shift and after every move and setup, not once a day.
  • The A/D director must be a competent person and a qualified person, or a competent person assisted by one. Being an experienced operator is not the same thing.
  • A boom is pulled over backwards by booming up too far with a light load, not by a heavy one. That is what boom stops are for.
  • After assembly the crane must be inspected before use, to verify it is configured as the manufacturer requires.