Conduit Fill

How full an EMT run is with identical THHN or XHHW conductors, from Chapter 9 Tables 4 and 5, against the limit for that many conductors. Two conductors may fill only 31%, which catches people out.

Insulation
Count the ground

Fill

7.5 % full

Limit 40 % · 3 × 12 THHN in 3/4" EMT

Inside the 40% Chapter 9 allows for 3 conductors.

How it's worked out

Fill % = total conductor area ÷ conduit area × 100

  1. One 12 THHN conductor — Chapter 9, Table 50.0133 sq in each= 0.0133 sq in
  2. All 3 of them0.0133 × 3= 0.0399 sq in
  3. 3/4" EMT holds — Chapter 9, Table 40.533 sq in= 0.533 sq in
  4. Fill0.0399 ÷ 0.533 × 100= 7.5 %
  5. Three or more may fill 40% — Chapter 9, Table 1limit= 40 %

The other eleven tools