A deliberately pessimistic planning figure for the load on the worst outrigger, for when the manufacturer's reaction chart is not to hand.
On the worst outrigger
76,500 lb
On the worst outrigger · 38.25 tons
Swing the boom over a corner and that corner takes far more than a quarter. This is the planning figure the trade uses when the reaction chart is not to hand, and it is deliberately pessimistic. The real number comes from the manufacturer's outrigger reaction chart or from an engineered lift plan, and that number governs. Under 29 CFR 1926.1402 the duty to provide ground that can take it sits with the controlling entity, and 1926.1412(d) makes you check the ground conditions before every shift.
How it's worked out
Worst corner = (crane weight + total load) x worst-corner share
- Total weight the ground has to carry90,000 lb + 12,000 lb= 102,000 lb
- If it shared evenly across four outriggers102,000 lb / 4= 25,500 lb
- It never shares evenly. Worst corner at 75%102,000 lb x 0.75= 76,500 lb