The air gap an outlet needs: twice the effective opening, three times near a wall, and never less than one inch.
Minimum air gap
1.50 in
Clear of obstructions
Measured vertically from the lowest point of the outlet down to the flood level rim. An air gap is the only method that cannot fail mechanically, which is why it outranks every assembly.
How it's worked out
Air gap = 2 x effective opening, never less than 1 in
- Apply the multiplier0.750 in x 2= 1.50 in
- Apply the one inch floorGreater of 1.50 and 1.00= 1.50 in