Skip to content

PVB Test Walkthrough

The pressure vacuum breaker test, one step at a time: the air inlet first, then the check valve.

The air inlet is tested first and the check valve second. Both carry a 1.0 psi mark. Note the order, because the spill-resistant version reverses it.

Phase 1 of 4 · step 1 of 5 in this phase · 1 of 20

Preparation

Set up so the readings mean something and nobody is surprised by the water going off.

Tell the customer the supply is about to be shut off.

Why this step exists

A test isolates the service. Doing that unannounced to a restaurant at noon or a dialysis clinic at any hour is how testers lose accounts.

See every step at once
  1. Preparation

    Set up so the readings mean something and nobody is surprised by the water going off.

    1. Tell the customer the supply is about to be shut off.
    2. Look over the installation before touching anything.An assembly installed backwards will produce readings that look like component failures.
    3. Flush the test cocks. Open 4, then 3, then 2, then 1, and close them in the reverse order, 1, 2, 3, 4.Skipping this is the fastest way to need a gauge recalibration you did not budget for.
    4. Fit the adapters and check the kit over.
    5. Close every needle valve on the kit.
  2. Test 1, the air inlet

    Find the pressure at which the air inlet begins to open, and confirm it opens all the way once the body empties.

    1. Take the air inlet canopy off.
    2. Hose from test cock 2 to the high side of the kit, then open test cock 2.
    3. Purge the high side on the high bleed, then close it.
    4. With the kit held level with the air inlet, close the number 2 shut-off, then close the number 1 shut-off.The kit has to be at the level of the air inlet, not at the level of whatever is convenient.
    5. Open the high bleed slowly, no more than a quarter turn, and let the pressure fall gently.A fast drop will read low. This is the same trap as the RP relief valve.
    6. Read the pressure at the instant the air inlet opens.Record: Air inlet opening point, 1.0 psi or higher to pass
    7. Close the high bleed, take the high hose off test cock 2 to let the body drain, and watch whether the air inlet opens fully.Record: Air inlet opened fully, yes or no
    8. If the air inlet never opened, suspect the number 1 shut-off is passing water. Work it open and closed to reseat it and try again.
  3. Test 2, the check valve

    Measure the static drop across the check with the body at atmosphere.

    1. High hose to test cock 1, then open test cock 1.
    2. Purge the high side, then close the high bleed.
    3. With the kit level with test cock 2, close the number 1 shut-off, then open test cock 2.
    4. When water stops draining from test cock 2, read the differential.Record: Check valve differential, 1.0 psid or higher
  4. Return to service

    Leave the assembly and the kit the way you found them.

    1. Close all test cocks and open both shut-offs.
    2. Remove the equipment and refit the canopy.
    3. Open every needle valve to drain the kit.

What the readings have to meet

  • Air inlet: Begins to open at 1.0 psi or higher above atmosphere, and opens fully once the body drains AWWA M14 Appendix B, ASSE 1020
  • Check valve: Holds 1.0 psid or higher ASSE 1020

Procedures differ between test kits and between water purveyors. This is the widely taught differential gauge sequence. Confirm the procedure your own authority accepts before you use it on a report.

The other twenty-three tools