DC Pass or Fail
Whether a double check passed: each check at 1.0 psid or higher and both drip tight.
Result
PASSED
Return to service
Both checks hold. On a detector assembly, confirm the bypass meter registered flow before signing the report.
How it's worked out
CV1 >= 1.0 psid and CV2 >= 1.0 psid, both drip tight
- Check valve #1 differential2.4 against a 1.0 psid minimum= Pass
- Check valve #2 differential1.8 against a 1.0 psid minimum= Pass
- TightnessA gauge reading that falls to zero means a leak= Both closed tight