Skip to content

DC Test Walkthrough

The double check test, one step at a time: one measurement taken twice. The best procedure to learn first, because the RP repeats the same straddling technique twice.

Two questions, asked the same way twice: does each check hold at least 1.0 psid, and does each one close drip tight.

Phase 1 of 5 · step 1 of 5 in this phase · 1 of 20

Preparation

Set up so the readings mean something and nobody is surprised by the water going off.

Tell the customer the supply is about to be shut off.

Why this step exists

A test isolates the service. Doing that unannounced to a restaurant at noon or a dialysis clinic at any hour is how testers lose accounts.

See every step at once
  1. Preparation

    Set up so the readings mean something and nobody is surprised by the water going off.

    1. Tell the customer the supply is about to be shut off.
    2. Look over the installation before touching anything.An assembly installed backwards will produce readings that look like component failures.
    3. Flush the test cocks. Open 4, then 3, then 2, then 1, and close them in the reverse order, 1, 2, 3, 4.Skipping this is the fastest way to need a gauge recalibration you did not budget for.
    4. Fit the adapters and check the kit over.
    5. Close every needle valve on the kit.
  2. Check valve #1

    Measure the static pressure drop across the first check with the downstream side at atmosphere.

    1. High hose to test cock 2, low hose to test cock 3.
    2. Open test cock 2, purge the high side on the high bleed, then close it.
    3. Open test cock 3, purge the low side on the low bleed, then close it.
    4. Close both shut-off valves to isolate the assembly.
    5. Release water from downstream of the check until that side is at atmosphere.
    6. Hold the gauge centre line level with the downstream test cock reference point.On a 1.0 psid pass mark, two feet of gauge error is most of the margin.
    7. When flow stops and the needle settles, read the differential.Record: Check valve #1 differential, 1.0 psid or higher. A reading that falls to zero means the check leaked.
  3. Check valve #2

    Repeat the same measurement one check further downstream.

    1. Move the high hose to test cock 3 and the low hose to test cock 4.
    2. Purge both sides again, high then low, and close the bleeds.
    3. Release water downstream of the second check until it is at atmosphere.
    4. When flow stops and the needle settles, read the differential.Record: Check valve #2 differential, 1.0 psid or higher
  4. Detector assemblies only

    Confirm the bypass meter sees flow.

    1. Crack test cock 4 open on the mainline assembly and watch the bypass meter dial.Record: Bypass meter registered flow, yes or no
  5. Return to service

    Leave the assembly and the kit the way you found them.

    1. Close the test cocks and remove the equipment.
    2. Open every needle valve to drain the kit.
    3. Open the shut-off valves slowly.

What the readings have to meet

  • Check valve #1: Holds tight at 1.0 psid or higher Field test criteria (USC, AWWA M14)
  • Check valve #2: Holds tight at 1.0 psid or higher Field test criteria (USC, AWWA M14)
  • Bypass meter, detector assemblies only: Registers flow when test cock 4 is cracked open AWWA M14 Appendix B

Procedures differ between test kits and between water purveyors. This is the widely taught differential gauge sequence. Confirm the procedure your own authority accepts before you use it on a report.

The other twenty-three tools