RP Test Walkthrough

The reduced pressure principle test phase by phase, one step at a time. Nobody forgets that a relief valve opens at 2.0 psid; people forget which bleed closes first.

Four things get established: that check valve #1 holds tight, at what differential the relief valve opens, that check valve #2 holds against backpressure, and that check valve #1 holds enough pressure to keep a safe margin above the relief valve.

Phase 1 of 6 · step 1 of 5 in this phase · 1 of 34

Preparation

Set up so the readings mean something and nobody is surprised by the water going off.

Tell the customer the supply is about to be shut off.

Why this step exists

A test isolates the service. Doing that unannounced to a restaurant at noon or a dialysis clinic at any hour is how testers lose accounts.

See every step at once
  1. Preparation

    Set up so the readings mean something and nobody is surprised by the water going off.

    1. Tell the customer the supply is about to be shut off.
    2. Look over the installation before touching anything.An assembly installed backwards will produce readings that look like component failures.
    3. Flush the test cocks. Open 4, then 3, then 2, then 1, and close them in the reverse order, 1, 2, 3, 4.Skipping this is the fastest way to need a gauge recalibration you did not budget for.
    4. Fit the adapters and check the kit over.
    5. Close every needle valve on the kit.
  2. Observe check valve #1

    Find out whether the first check closes tight at all, before asking how much it holds.

    1. High hose to test cock 2. Low hose to test cock 3.
    2. Open test cock 3 slowly, then open the low bleed.
    3. Open test cock 2 slowly, then open the high bleed.Opening a test cock quickly can slam the check and give you a false observation.
    4. Close the bleeds, high side first and low side last.This is the order people commonly reverse under pressure.
    5. Close the outlet shut-off valve.
    6. Watch the needle and decide whether check valve #1 is closed tight or leaking.Record: Check valve #1: closed tight or leaking
  3. Record the relief valve

    Find the differential at which the relief valve first begins to discharge.

    1. Open the high control valve one full turn.
    2. Open the low control valve slightly, no more than a quarter turn.A quarter turn is a limit, not a target.
    3. Read the differential at the moment the relief valve first discharges.Record: Relief valve opening point, 2.0 psid or higher to pass
    4. Close the low control valve.
  4. Observe check valve #2 under backpressure

    Establish that the second check holds when pressure tries to come back through the assembly.

    1. Bleed the vent, or bypass, hose.
    2. Attach the vent hose to test cock 4.
    3. Close the vent control valve.
    4. Open test cock 4.
    5. Reset the gauge on the low bleed to re-establish a differential across check valve #1.
    6. Open the vent control valve one full turn.
    7. Watch the relief valve vent. If it drips, reset the gauge on the low bleed and watch again. A second drip means check valve #2 has failed.Record: Check valve #2: closed tight or leaking
    8. Close the vent control valve, but only if check valve #2 leaked.
  5. Record check valve #1, the shut-off, then check valve #2

    Take the numbers that go on the report.

    1. Reset the gauge on the low bleed to relieve disc compression.
    2. Read the check valve #1 differential.Record: Check valve #1 differential, 5.0 psid or higher and at least 3.0 above the relief valve opening point
    3. Close test cock 2, wait, and watch the gauge for a rise that would mean the outlet shut-off is passing water.Record: Outlet shut-off valve: closed tight or leaking
    4. Close the vent control, close test cocks 3 and 4, and take the vent hose off test cock 4.
    5. Move the low hose to test cock 4 and the high hose to test cock 3.
    6. Open test cock 4 slowly then the low bleed. Open test cock 3 slowly then the high bleed.
    7. Close the high bleed first, then close the low bleed slowly.The same order as the first phase: the high bleed first, then the low bleed, slowly. Closing the low one first is what catches people.
    8. Read the check valve #2 differential.Record: Check valve #2 differential, 1.0 psid or higher
  6. Return to service

    Leave the assembly and the kit the way you found them.

    1. Close the test cocks and remove the equipment.
    2. Open every needle valve on the kit.
    3. Open the outlet shut-off valve slowly.Opening it fast sends a surge downstream and can lift debris into fixtures you are not being paid to fix.

What the readings have to meet

  • Relief valve: Opens at 2.0 psid or higher AWWA M14 Appendix B
  • Check valve #1: Holds 5.0 psid or higher AWWA M14 Appendix B
  • Buffer: Check valve #1 sits at least 3.0 psid above the relief valve opening point USC FCCC
  • Check valve #2: Holds tight against backpressure AWWA M14 Appendix B

Procedures differ between test kits and between water purveyors. This is the widely taught differential gauge sequence. Confirm the procedure your own authority accepts before you use it on a report.