RP Pass or Fail
Whether a reduced pressure principle assembly passed: the relief valve at 2.0 psid or higher, check valve #1 at 5.0, the 3.0 psid buffer between them, and both checks tight.
Result
PASSED
Return to service
All four criteria met. Record the readings and the gauge serial number on the test report.
How it's worked out
RV >= 2.0 psid CV1 >= 5.0 psid CV1 - RV >= 3.0 psid
- Relief valve opening point2.8 against a 2.0 psid minimum= Pass
- Check valve #1 differential6.2 against a 5.0 psid minimum= Pass
- Buffer, check valve #1 above the relief valve6.2 - 2.8 = 3.4= 3.4 psid, pass
- Check valve #1 tightnessObserved during the first phase of the test= Closed tight
- Check valve #2 tightness under backpressureRelief vent watched after resetting the gauge= Closed tight
The other twenty-three tools
Paperwork
The test
- DC Test WalkthroughStep by step, at the assembly
- RP Test WalkthroughStep by step, at the assembly
- PVB Test WalkthroughStep by step, at the assembly
- SVB Test WalkthroughStep by step, at the assembly
- DC Pass or FailReadings judged against the rule
- PVB / SVB Pass or FailReadings judged against the rule
- Gauge ElevationCorrecting for where it hangs